



VINGA Sortino Cooler bag
This mordern and clean looking cooler bag is your true friend on the next picnic. It´s a little bit smaller which makes it easy to carry over your shoulder. The cooler bag is in a melange fabric accompanied with PU details which makes it as fancy as a normal bag. It is easy to clean the bag because of the Polyethylene vinyl acetate backing.
Price by quantity
| Quantity | 1 pcs | 25 pcs | 50 pcs | 100 pcs | 250 pcs | 500 pcs |
|---|---|---|---|---|---|---|
| Price / pc | 83,11 | 81,57 | 79,26 | 74,10 | 72,62 | 68,40 |
Prices in RON, excluding VAT, for the unbranded product. The exact total is shown in the order calculator.
Branding options
| Technique | Position | Max. area | Max. colours | Price / pc** |
|---|---|---|---|---|
| Screen transfer default | front of the item | 100 × 100 mm | 6 | 6,26–19,94 RON |
| Digital transfer | front of the item | 100 × 100 mm | 4 | 12,84–38,81 RON |
| Digital transfer | back of the item | 100 × 100 mm | 4 | 12,84–38,81 RON |
| PU label Sortino | front of the item | 60 × 30 mm | single colour | 21,79–42,37 RON |
| PU label Sortino | back of the item | 60 × 30 mm | single colour | 21,79–42,37 RON |
| Screen transfer | back of the item | 100 × 100 mm | 6 | 6,26–19,94 RON |
Setup (paid once per order): Screen transfer — 137,50 RON/colour · PU label Sortino — 258,50 RON
** Prices are for a single-colour logo; with more colours, the unit price and setup increase per colour. The unit price decreases with quantity — the range covers tiers from 1 to 10,000 pcs.; the exact total is shown in the order calculator. Branding data is the manufacturer's official specification. Send us your logo (vector: AI, EPS, PDF or SVG) and you get a free mockup before production.
Specifications
Material: Polyethylene terephthalate Dimensions: 23 x 20 x 27 cm
Quick order
Minimum order RON 1,500 excl. VAT (EUR 300 export), plus branding (if any). We confirm stock, final price and lead time within 24h.
* The 24/48h delivery applies to the product from stock. If you choose branding, the lead time increases and we confirm it in the quote, based on technique and quantity.